    Concrete Calculator: Yardage, Bags & Ready-Mix Cost

    Free concrete slab calculator — find the cubic yards of concrete you need, the 60 lb and 80 lb bags of concrete it takes, and total ready-mix cost for any slab, driveway, patio, or footing.

    Autosave on
    Concrete needed
    2.72 cu yd
    66.67 cubic feet (incl. 10% waste)
    Estimated cost
    $407
    60 lb bags
    163
    If using premix bags
    80 lb bags
    123
    If using premix bags

    Enter the length, width, and thickness of your concrete project. This concrete calculator returns concrete yardage in cubic yards (with waste), the bags of concrete it would take in 60 lb and 80 lb sizes, and total ready-mix concrete cost.

    How concrete yardage is calculated

    Concrete is sold by the cubic yard, but slabs are measured in feet and inches — so the math is a unit conversion. Take length × width × thickness, convert thickness from inches to feet (divide by 12), and that's your volume in cubic feet. Divide by 27 (the number of cubic feet in a cubic yard) and you have the cubic yards of concrete you need before any waste factor.

    A 20 ft × 10 ft patio at 4 inches thick is 20 × 10 × (4/12) = 66.7 cubic feet, or 66.7 ÷ 27 ≈ 2.47 cubic yards. With a 10% waste factor that becomes about 2.72 cubic yards. Ready-mix is typically sold in quarter-yard increments, so you would order 2.75 yards.

    For irregular shapes, break the project into rectangles and add the volumes. Circular slabs use π × radius² × thickness. Stem walls and footings are usually calculated separately from the slab they support, then added to the order.

    Bags of concrete vs ready-mix delivery

    A 60 lb bag of premix yields about 0.45 cubic feet (≈ 1/60 of a cubic yard). An 80 lb bag yields about 0.6 cubic feet (≈ 1/45 of a cubic yard). For a 2.5-cubic-yard pour, that is roughly 150 sixty-pound bags or 113 eighty-pound bags — and many hours of mixing.

    The practical break-even is about one cubic yard. Below that, bagged premix from a hardware store is usually faster and cheaper than the short-load fee a ready-mix supplier charges. Above one cubic yard, ready-mix wins on price, consistency, and finish quality. Above three cubic yards, ready-mix is the only sensible choice.

    Ready-mix prices in mid-2026 typically run $150–$200 per cubic yard delivered, plus a short-load fee of $50–$150 per yard short of a full truck (usually 8–10 yards). Pumping adds another $1.50–$4.00 per cubic foot depending on reach.

    Slab thickness and waste factor — what to actually use

    Sidewalks and patios: 4 inches over a compacted 4-inch gravel base. Residential driveways: 4 inches for cars, 5–6 inches if a delivery truck or RV will park on it. Garage floors: 4 inches with #4 rebar at 18-inch centers. Footings: code-required depth (often 12 inches × twice the wall width), check local code.

    Waste factor accounts for over-excavation, uneven subgrade, spillage at the chute, and the small amount left in the truck. 10% is a safe default for most homeowner pours. Add 5% on top of that for pump pours or complex form work, and an extra bag or two if you are mixing by hand and want a comfortable cushion.

    Reinforcement (rebar, mesh, fiber) is a separate calculation and is not included in the yardage above. For slabs over 4 inches, plan on either #3 rebar in a 16-inch grid or 6×6 W2.9×W2.9 welded wire mesh.

    Common mistakes

    Forgetting to subtract for haunches, thickened edges, or stem walls when ordering separately — and then running short.

    Ordering exactly to the calculated volume with no waste factor. The truck driver will not wait while you scramble for more concrete, and a cold joint formed by a second pour is a visible long-term defect.

    Mixing slabs and footings in the same order without telling the dispatcher. Footings often want a stiffer mix (lower slump) than a finished slab.

    Skipping the gravel base. Concrete needs a uniform, compacted, free-draining base or it will crack along the weak spot regardless of how thick the slab is.

    Frequently asked questions

    How much waste should I add?

    Most professionals add 5–10% extra to cover spillage, uneven subgrade, and shape variations. Add more for complex forms or if the mix is being pumped.

    Should I use bags or ready-mix concrete?

    Bags work well for projects under about 1 cubic yard (roughly 60+ bags). Anything larger is significantly cheaper and faster with a ready-mix delivery.

    What is the standard slab thickness?

    Patios and walkways: 4 inches. Car driveways: 4 inches. Truck driveways: 5–6 inches. Garage floors: 4–6 inches.

    What is the average cost per cubic yard?

    Ready-mix concrete typically runs $120–$200 per cubic yard delivered, plus a small-load fee for orders under about 3 cubic yards.

    How long does concrete take to cure?

    Initial set within 24–48 hours (light foot traffic OK). Full cure — reaching design strength — takes 28 days. Temperature and humidity influence both timelines.

    Do I need rebar in my slab?

    Rebar adds tensile strength. For structural slabs, driveways, or areas with heavy loads it is strongly recommended. Simple patios may not require it, but it still improves durability.

    By Larius software engineer, NC real estate broker & CRE/business appraiserLast reviewed: June 2026Reviewed by the Handy Calculators editorial teamHow we build calculators